Mix ratio M20: 1 : 1.5 : 3 (cement : sand : aggregate)W/C = 0.5

How the Concrete Mix Ratio Calculator Works

The calculator uses IS 456:2000 nominal mix proportions. For a given grade and volume, it computes dry material quantities using a dry volume factor of 1.54 (wet concrete shrinks ~35% when cured), cement density of 1440 kg/m³, and the water-cement ratio for each grade. Formula: Dry volume = Volume × 1.54, then each material is proportioned by the C:S:A ratio.

Concrete Grade Reference Table

GradeRatio (C:S:A)Strength (MPa)Typical Use
M101:3:610Lean mix, blinding concrete
M151:2:415Mass concrete, unreinforced
M201:1.5:320RCC slabs, beams, columns
M251:1:225Bridges, heavy structures
M30Design mix30High-rise, pre-stressed

Worked Examples

  • Slab 5m × 4m × 0.15m = 3 m³, Grade M20 (1:1.5:3): Dry volume = 3 × 1.54 = 4.62 m³. Cement = 4.62 × (1/5.5) × 1440 = 1210 kg. Sand = 4.62 × (1.5/5.5) = 1.26 m³. Aggregate = 4.62 × (3/5.5) = 2.52 m³.
  • Footing 1 m³, Grade M15: Dry volume = 1.54 m³. Ratio 1:2:4 (sum=7). Cement = 1.54/7 × 1440 = 317 kg (7 bags of 50 kg). Sand = 0.44 m³. Aggregate = 0.88 m³.
  • Driveway slab 10 m³, Grade M25: Dry volume = 15.4 m³. Ratio 1:1:2 (sum=4). Cement = 15.4/4 × 1440 = 5544 kg (111 bags). Order ready-mix at M25 grade.

Frequently Asked Questions

What is the most common concrete mix ratio for slabs?
M20 (1:1.5:3) is the standard for reinforced concrete slabs, beams, and columns. It achieves 20 MPa at 28 days, which meets minimum structural requirements in most residential codes.
How much cement do I need per m³ of M20 concrete?
Approximately 403 kg of cement (about 8 bags of 50 kg) per m³ of M20 concrete, using a 1:1.5:3 ratio with a dry volume factor of 1.54.
What does the water-cement (W/C) ratio mean?
The W/C ratio is the mass of water divided by the mass of cement. Lower W/C (e.g., 0.45) gives stronger, denser concrete but is harder to place. Higher W/C (0.60) is workable but weaker. M20 uses W/C = 0.55.
Can I use this for M30 and above?
M30 and above are design mixes — the ratio is determined by trial batching and laboratory testing, not nominal proportions. Use this calculator for M10 to M25 only. For M30+, consult a structural engineer.