Hole diameter = 3× post width is the standard rule for fence posts.

Hole dimensions

Post (optional — subtract post volume)

Bag yield

How to Calculate Concrete for Post Holes

Formula: Hole volume (m³) = π × (diameter/2)² × depth. If a post is in the hole, subtract the post volume: round post = π × (post diameter/2)² × depth; square post = width² × depth. Net concrete = hole volume − post volume. Bags = ceil(net total ÷ yield per bag). Yield per bag must come from your product label, not from bag weight alone.

Why Mixing Per Hole Can Use More Bags

When you mix each hole separately, you round up per hole — which means wasted partial bags multiplied by the number of holes. Example: if each hole needs 1.8 bags, mixing per hole requires 2 bags × 10 holes = 20 bags. Mixing all concrete at once would need ceil(18) = 18 bags — saving 2. In practice, most fence-post jobs mix hole by hole, so buy the per-hole figure.

Post Hole Sizing Guide

The standard rule is: hole diameter = 3× the post width, and depth = at least 1/3 of the above-ground post height (minimum 600 mm). In cold climates, holes must extend below the frost line — typically 900–1200 mm. In Australia, 450–600 mm is typical for residential fences.

Worked Example

10 fence posts, 100×100 mm square, hole 300 mm diameter × 600 mm deep, 25 kg bags (0.0125 m³ yield):

  • Hole volume = π × 0.15² × 0.6 = 0.0424 m³/hole
  • Post volume = 0.1 × 0.1 × 0.6 = 0.006 m³/hole
  • Net = 0.0424 − 0.006 = 0.0364 m³/hole
  • Total net = 0.0364 × 10 = 0.364 m³; all at once: ceil(0.364 / 0.0125) = 30 bags
  • Per hole: ceil(0.0364 / 0.0125) × 10 = 3 × 10 = 30 bags

Frequently Asked Questions

How deep should post holes be for a fence?
At minimum, 1/3 of the total post length should be in the ground. For a 1.8 m fence with 2.4 m posts, bury at least 600 mm. In windy or exposed areas, go to 750–900 mm.
Should I subtract the post volume?
For a rough estimate, it doesn't matter much — a 100 mm square post in a 300 mm hole displaces about 14% of the hole volume. For larger posts or many holes, subtracting gives a more accurate purchase quantity.
Can I pour concrete directly into the hole without mixing?
Yes — this is the dry-pour method. Pour dry pre-mix concrete around the post, then add water gradually. It works for fence posts in non-frost climates. For structural posts, wet mixing gives more reliable strength.