Concrete Volume Calculator (Slab)
Calculate how much concrete you need for a flat slab or floor.
How to Calculate Concrete Volume for a Slab
Formula: Volume (m³) = Length × Width × Thickness (thickness entered in cm and converted to m automatically). The result is shown in both m³ and cubic yards, plus the number of 50 kg pre-mix bags needed.
Worked Examples
- Garden shed base 3 m × 3 m at 10 cm: 3 × 3 × 0.10 = 0.9 m³ → 38 bags of 50 kg (includes 8% wastage).
- Garage floor 6 m × 6 m at 15 cm: 6 × 6 × 0.15 = 5.4 m³ → order ready-mix concrete, approximately 1 truck load.
- Driveway 12 m × 3 m at 10 cm: 12 × 3 × 0.10 = 3.6 m³ → 155 bags, or order ready-mix.
Standard Slab Thickness Guide
Choosing the right thickness is critical: 75–100 mm — light-duty path or garden slab (foot traffic only). 100–150 mm — residential garage floor or driveway (passenger vehicles). 150–200 mm — commercial floor or heavy vehicle access. 200 mm+ — structural slabs, always engineer-specified. Add reinforcement (mesh or rebar) for anything above foot traffic.
Bags vs Ready-Mix Concrete
Pre-mix bags are cost-effective for jobs under 1 m³. Above 1 m³, ready-mix concrete (ordered by the m³) is faster, stronger (consistent machine-mixed ratio), and often cheaper per m³. Most ready-mix suppliers have a minimum order of 3–5 m³ and charge a short-load fee below that.
Frequently Asked Questions
- How many bags of concrete do I need for a 1 m³ slab?
- 40 bags of 50 kg pre-mix (each bag covers 0.025 m³). With 8% wastage, order 44 bags. A 25 kg bag covers 0.0125 m³, so you need 80 of those.
- How thick should a concrete slab be for a car?
- Minimum 100 mm for a light passenger vehicle, and 125–150 mm is recommended for a residential garage. Use steel mesh reinforcement (SL72 or SL82) and pour over a compacted 75 mm gravel base.
- Why add 5–10% extra to the concrete order?
- Concrete volume calculations assume a perfectly flat, uniform subgrade. In reality, the base is never perfectly level — low spots consume more concrete. Add at least 8–10% buffer to avoid running short mid-pour.
- How long does a concrete slab take to cure?
- Concrete reaches walking strength in 24–48 hours, vehicle traffic strength in 7 days, and full design strength (28-day compressive strength) at 28 days. Keep it moist and covered for the first 3–7 days for best results.