Cut & Fill Volume Calculator

Estimate earthwork volume for grading — how much soil to cut or fill.

Advertisement

How to Calculate Cut and Fill Volume (Metric)

Formula: Volume (m³) = Length (m) × Width (m) × |Existing Level − Finished Level| (m). If the existing ground is higher than the finished grade, the result is a cut (soil is removed). If lower, it is a fill (soil is imported). This calculator uses the simplified prismatic method, which assumes uniform slope across the site.

Worked Examples

  • Level cut for a building pad: 20 m × 15 m, existing level 101.5 m, finished level 100.8 m → height diff = 0.7 m → 210 m³ cut.
  • Fill for a low-lying yard: 10 m × 8 m, existing level 99.2 m, finished level 100.0 m → height diff = 0.8 m → 64 m³ fill.
  • Embankment fill: 50 m × 12 m, existing 98.5 m, finished 100.0 m → height diff = 1.5 m → 900 m³ fill — approximately 90 truck loads (10 m³ truck).

Cut vs Fill — What is the Difference?

Cut means the existing ground is above the desired finished level — soil must be excavated and removed or stockpiled. Fill means the existing ground is below the finished level — imported material (soil, gravel, or engineered fill) must be brought in and compacted. Balancing cut and fill on site minimises haulage costs — cut material from high areas can be reused as fill in low areas.

Bulking and Compaction Factors

Soil changes volume when disturbed. Bank measure (in-situ) is what this calculator gives you. When excavated, soil bulks up by 20–30% (loose measure). When placed as fill and compacted, it shrinks by 10–15% from bank measure. For accurate fill ordering, multiply the bank volume by 1.15–1.25 to account for compaction losses.

Frequently Asked Questions

What is the difference between cut and fill in construction?
Cut is the removal of earth from areas above the design level. Fill is the placement of material in areas below design level. Together they describe how a site is graded to achieve a flat or controlled surface for construction.
How accurate is the prismatic cut-fill method?
Accurate for flat sites with a single uniform slope. For sites with variable terrain, the average end area method or grid method gives better results. This calculator is best used for preliminary quantity estimates.
How many cubic metres can a dump truck carry?
A standard 10-wheeler dump truck carries approximately 8–12 m³ (loose measure) depending on soil type. A semi-trailer tipper can carry 20–25 m³. Use these figures to estimate the number of truck loads needed.
What if my site has both cut and fill areas?
Calculate each zone separately and compare totals. If cut volume exceeds fill volume, excess soil must be removed from site. If fill exceeds cut, additional material must be imported. Aim for a balanced earthworks design to minimise costs.